三良木設計有限公司
香港北角英皇道75-83號 聯合出版大廈13樓1301室
Tel No :
Fax No :
E-mail :
Contact Person :
Post :
Established in Year :
Total no of staff :
Total no of Registered Architect :
Total no of Authorized Person :
2511 4711
2519 9719
sdlhm@hkstar.com
Leung Hon Ming
Director
1992
14
3
2
An overall 93,247sq.m. gross floor area complex consists of residential, office and hotels located in Zhong Shan, China. The complex provides over 70,000 sq.m of class A office space. Constructing in phases, the first 3 office towers completed in 2009 & 2010. Another 20 storeys office tower with 20,000sq.m. completed in 2012.
The Summit Phase II at the Park is one of the urban project for Zhongshan CBD development. The site has covered 82,700 sq.m, it is surround by the largest natural green park in the city- Zimaling Park. The project will include various type of building such as: office tower, shopping centres, hotel and service apartment blocks. When completed, the centre will provide 400,000 sq.m of commercial space.
First phase will start end 2011
2 office towers & a commercial podium to be designed right along the city's main commercial Axis and will be completed in 2014.n overall 93,247sq.m. gross floor area complex consists of residential, office and hotels located in Zhong Shan, China. The complex provides over 70,000 sq.m of
class A office space.
Total Area: 77,700 sq.m.
An overall 93247sq.m. gross floor area complex consists of residential, office and hotels located in Zhong Shan, China. The complex provides over 300 high quality residential units ranged from 100 to 350sq.m each.
Phase II will begin 2011 spring and provide another 300 units of residential.
The newly completed PolyU Student Hostel Lecture Threatre was completed on August 2012, and was open at the year 2012. The lecture theatre is designed to accommodate 251 audience/student seats with 4 nos. of wheelchair spaces. To make the lecture theatre fully utilized, different lighting, acoustic and A/V facilities are incorporated.
The newly completed CUHK Basic Medical Science Building was completed on April 2013. The whole building was re-organized to fit the new 3-3-4, including remodeling of embalming room, dissecting lab, teaching lab for medical department & nursing department & a learning common area with mini cafeteria to divert the over loading of the existing canteen on G/F.
Total area approx.: 5,000 sq.m.
The Library Building is actually a multi-function building which composed of Library, Self-revision room, Multi-function Hall, Lecture Theatre, Classroom, General Office and Meeting Room with a few big roof garden.
SDL was commissioned to work from the design stage, provided supervision on the construction stage and certified the completion of the building for both the exterior and interior works.
Area: 21190sqm.
Completion in 2009
An overall 110,000 sq.m GFA entertainment complex consists of hotels, residential, retails, restaurants and entertainment facilities located Foshan, Guangdong, China. This complex will serve as an icon of leisure lifestyle and a centre of recreational activities for the near by thriving communities.
A 13 stories 3 star hotel located in Dali, Guangzhou, gross floor area of 20,000 sq.m. serving 220 bedrooms with provision of supporting facilities such as Chinese and Western dining, swimming pool, gym and a podium landscape garden.
In connection with this hotel, an annex building with KTV, restaurant and luxurious apartment was added to form a hotel plaza.
Completion in 2010